Hello, Welcome to visit LuoYang Xinsheng Radiator Manufacturing Co.,Ltd Website。
After the severe cold, the temperature rose slightly, and many cities ushered in long-lost good weather. Before the next wave of cold hits, it is better to buy a set of surface-mounted radiators for your family to spend a warm New Year.
What is a surface mounted radiator?
Ming-mounted radiator means that the heating water pipe and return pipe are exposed, and it is suitable for installation in new and old houses. The heating pipes are located in hidden locations such as baseboards, inner corners, suspended ceilings or behind curtains and furniture. They are horizontal and vertical, without excavation and backfilling, and basically do not affect the original decoration, simple and beautiful. There is no requirement for floor materials, which can be used immediately to meet the needs of rapid heating.
Will the installation of radiators affect the appearance of the room?
For the house that has been renovated, the heating method is exposed radiator. Although the exposed radiator pipes and radiators are exposed outside, the designer tries to conceal and install the pipes along the corners and behind the home as far as possible, without damage Interior decoration structure. In addition, the radiator continues to develop, and its appearance is diverse and beautiful. It can be matched according to the interior decoration style, and it can also complement the interior decoration.
How to install surface radiator?
field survey
On-site measurement, plan design. When communicating the plan with the customer in the early stage, it is necessary to measure the area of the house in the household in advance, communicate with the owner and determine the type of radiator that needs to be installed, the number of radiators, the way of water inlet and outlet, and the specific installation location. Water quality, etc., and design feasible installation Program.
Lay the pipeline
The form of exposed radiator does not need to be slotted. The pipe routing is determined according to the house structure and the decoration situation of the house surveyed by the engineer in advance, and the location, size and pipeline direction of the heat dissipation equipment are reasonably arranged according to the predetermined plan, and try to be reasonable and concealed . It is generally arranged in places such as suspended ceilings, inner corners and skirting lines for convenient concealment processing. If necessary, install buckle grooves that are similar in color to the wall. Pipe laying should not affect the interior decoration as much as possible, and the reasonable design should not take up too much space.
Suppression test
Test the pressure of the pipeline to ensure that the entire heating system will not leak or break during use.
valve installation
Valve installation. Install temperature control valves at the water inlet and return water inlet to ensure that the room temperature can be adjusted separately during use.
install radiator
Exposed radiators are like hidden radiators, and need to be installed in a place where the air is easy to convection to ensure good heat dissipation. The more common choice is near doors and windows, which saves indoor space and can heat the cold air entering the gap to ensure heating. In addition, it is recommended to install the radiator after the wall of the user's home is painted, or after the wallpaper is pasted, to prevent damage to the heater during wall painting.
When installing the radiator, place the radiator steadily, connect the valve connector with the water inlet and outlet valves, use a level to measure whether the radiator is straight and whether the pipeline installation meets the requirements, and then use a pipe clamp to tighten the connection.
install wall-hung boiler
The wall-hung boiler is installed in the kitchen or balcony close to the water source, gas source and power source. The original gas water heater or a nearby location can also be selected. However, there must be no electric wires and electrical equipment above the wall-hung boiler, and the net distance between the boiler and the electrical equipment should be greater than 300mm , Do not place explosives and other volatile dangerous goods near the boiler.
suppression detection
After the installation of the radiator and the wall-hung boiler, the radiator system shall be subjected to a pressure test to prevent problems such as running, emitting, dripping, and leakage during use, and the entire radiator system shall be inspected and accepted.
The installation cycle of the exposed radiator is short, and it can be installed in one day, allowing residents to enjoy a warm and comfortable home environment in winter without destroying the existing decoration, and can be integrated with the existing decoration at home. Dust protection will be done before construction. Rhinestones are used when drilling the wall during the construction process, which is dust-free and low-noise, and basically does not affect the daily life of the family. Both new and old houses can be installed, and the installation is convenient, so hurry up to buy a set before, and have a warm New Year!
If you are interested in our products or services, you are welcome to contact us
PHONE:
+86-379-63482552
EMAIL:
1527377436@qq.com
ADDRESS:
No.2, steel Chengzhong Road, Dingding North Road, Luoyang